Home
Pricing
Contact
Talk to an Expert
HomeGuidesProduct updatesUse CasesPricingContactTalk to an Expert

OpenDrawing

AI-Native Document Processing

Product

  • How it works
  • Pricing
  • Contact

Resources

  • Guides
  • Product updates
  • Use cases

Legal

  • Privacy
  • Terms
  • Cookies

Social

© 2026 OpenDrawing. All rights reserved.
← Back to use cases
Use case

Electrical Contractors

June 2026
Bids per estimator per year
25
Manual
200+
OpenDrawing

Direct Answer

For electrical contractors the estimating bottleneck is usually the takeoff: reading every drawing, identifying and counting components, and transcribing them into a spreadsheet. Automating the extraction leaves the estimator to review and price a pre-populated bill of materials, which can raise bidding capacity without more headcount.

For electrical contractors, the estimating bottleneck is almost always the takeoff - the manual process of reading through every drawing in a set, identifying every component, counting quantities, and transcribing everything into a spreadsheet or estimating system. It is slow, prone to error, and scales only by adding headcount. OpenDrawing automates the extraction step, turning a full-day task into a 5-minute review.

What Gets Automated

From schematic and single-line drawings: OpenDrawing identifies and counts every electrical component - breakers, panels, transformers, disconnects, meters, relays, motor starters, contactors, and dozens of other component types - and reads the specifications annotated beside each symbol (voltage rating, current rating, phase count, ampere frame, manufacturer callouts). The result is a complete component list with quantities and specifications, ready for pricing.

From conduit schedules and wire schedules: When the drawing package includes conduit schedules or wire schedules, OpenDrawing extracts the run data - conduit size, type, quantity, and length; wire gauge, insulation type, and quantity - and includes it in the takeoff output alongside component counts. Wire and conduit quantities within diagrams (where runs are shown graphically but not scheduled) require a schedule document for automated extraction; if no schedule is present, the component BOM is still extracted in full.

The Bidding Volume Impact

A typical commercial electrical project drawing package takes an estimator 6–10 hours to manually take off. An estimator working 50 weeks per year can complete 25–35 bids per year at that rate, assuming takeoff is 60–70% of their estimating labor.

With automated takeoff, the same estimator reviews a pre-populated BOM in under 5 minutes. Bidding capacity rises to 200+ projects per year for a single estimator - not because they are working faster, but because the extraction step no longer consumes most of their time. The estimator's value shifts from data entry to judgment: bid/no-bid decisions, scope review, pricing strategy, and relationship management.

Accuracy and the Review Step

Automated takeoff accuracy on clean PDF drawing sets is typically 90%+ for component identification. The review step is not optional - it is a fast quality check, not a re-do from scratch. The estimator scans the extracted list against the drawings for omissions or misreads, makes corrections where needed, and approves the BOM for pricing. That review takes under 5 minutes on a typical commercial drawing set, versus 6–10 hours of manual extraction.

Low-confidence items are surfaced automatically in a review queue, so the estimator's attention goes directly to the items that need it rather than re-reading every page.

Integration with Estimating Systems

The extracted BOM exports to Excel and CSV for import into any estimating platform. For teams using Accubid, Trimble Estimation, or similar specialized electrical estimating software, the export format maps to the standard import schema. For teams using general estimating tools (Bluebeam, Procore, or custom spreadsheets), the Excel export loads directly without reformatting.

When a parts catalog is uploaded, the BOM also includes matched supplier part numbers and pricing references, further reducing the manual lookup step in the estimating process.

Getting Started

The fastest way to evaluate the fit is to send us a drawing package from a recently-completed project, one where you already know the correct quantities, and compare the extracted BOM against your manual takeoff. That comparison gives you a concrete accuracy reading on your specific drawing types before you rely on it for live bids.

Frequently Asked Questions

Why is takeoff the bottleneck in electrical estimating?+

It is slow, prone to error and scales only by adding people, because every drawing in a set has to be read and every component counted and transcribed.

Is a review step still needed with automated takeoff?+

Yes. The estimator checks the list, resolves anything flagged as low confidence and approves the bill of materials before pricing.

What does the output connect to?+

The bill of materials exports to estimating systems and spreadsheets, and can include matched supplier part numbers when a parts catalog is provided.

On this page

What Gets AutomatedThe Bidding Volume ImpactAccuracy and the Review StepIntegration with Estimating SystemsGetting Started
Talk to us about your drawings.

Send us a set and we will show you what we can pull out of it.

Talk to an Expert

Keep reading

Use case

Defense Contractors

July 2026
Use case

Data Centers & Energy

June 2026
Use case

Electric Utilities

June 2026

Talk to us about your drawings.

Send us a set and we will show you what we can pull out of it.

Talk to an Expert